+44 (0)1926 562652 info@aspeninfrastructure.co.uk

Proposal to develop a 30MW solar farm at Bilbo Farm, Crimond, Fraserburgh, Scotland have taken an important step forward.

Details of the scheme were outlined to stakeholders and residents at a recent public consultation event.

The feedback is now being appraised and will make a valuable contribution to finalising the design and development of the installation.